ATC

SOLUTION

ATC

The ATC is installed on the second level floor. Before working, it is necessary to manually place the EOAT at the tool changer station. When the whole line performs automatic tooling change, the racking system can automatically call the corresponding program according to the number to perform the EOAT automatic change function.

Message box

Are you looking for something else? Please get in touch with Aotto, we are pleased to answer your request.