

On March 23, 2015, experts from Shanghai Yuanhe Stamping Technology Co. Ltd and ZF Driveline Components (Shanghai) Co., Ltd., as well as Mr. Stefan Zauner, an expert from the German headquarters, conducted a pre-acceptance inspection on the multi-station transport system of the DQ380 project stamping production line. Mr. Miao Jinzhong, the Technical Vice President, gave a detailed introduction to the experts about the equipment's composition, product technology, operating conditions and carried out on-site operation tests. Mr. Stefan Zauner and the other experts were very satisfied with the acceptance situation and gave a wonderful summary. They also expressed their willingness to further cooperate with our company.
Are you looking for something else? Please get in touch with Aotto, we are pleased to answer your request.